interior: St-Hubert House

during construction-new floor poured

recycled wood for treads

Renovation of a basement into a finished apartment in a single-family dwelling. The floor was excavated and steel ceiling structure reinforced to add ceiling height and openness. A new heated polished concrete floor was poured throughout. The existing staircase was replaced with an open one to bring more light into the space. The kitchen and bathroom divide living space for an open bedroom area at the back. Recycled wood treads and elements used throughout.